Westfield High School

When the community supported WWS in their endeavor to address growing facility needs throughout the district with approval of a referendum, the largest allocation was put toward expanding the existing high school. Administrators saw this as an opportunity to not only address the needs of growing programs and an aging building, but to transform its education model and align the built environment with their pedagogical vision.

CSO studied existing facility use and programming information to quantify space utilization and projected student and program growth. Using CSO’s data, administrators decided to make the leap to a university model of education, allowing them to increase building efficiency and maximize the use of their budget to benefit as many parts of the building and programs as possible. In addition to this shift in space usage, WHS sought to accommodate growing demand for career ready programs, provide flexible areas for student use, and create spaces where students would want to spend time. All new and renovated spaces were designed to easily adapt to future program needs by minimizing built-in fixtures and maximizing use of mobile and flexible furniture. CSO worked closely with WHS to establish an aesthetic that mirrored the new educational direction with a high-tech, industrial feel while maintaining subtle touches that are distinctly Westfield.

The collaborative process between WHS and CSO and in-depth programming was critical to the success of this project. This approach allowed WHS to accomplish so much more than a traditional approach to projected growth would have allowed. The resultant custom tailored building will better support today’s students and staff in their endeavors and allow WHS to adapt to an unknown future much more readily and rapidly.

Homestead High School

Over the last several years the administration at Southwest Allen County Schools (SACS) began to dream about making major changes at Homestead High School (HHS). Primarily a single story building, students struggled to travel from one side to another during passing periods and there were few spaces able to facilitate informal student interactions or collaborative group work.

CSO was brought on board with local architect MKM and educational consultant Brain Spaces to begin programming and planning for the future Homestead. Extensive meetings with students, staff, parents, and community members quickly revealed immense support for changes at the high school and a desire for the building to better represent and support the students who walked its hallways. The design team collaborated to maximize the amount of new space to be constructed while leveraging portions of the existing facility to reach the desired program requirements.

The resultant design will include a new two story academic wing, large student commons, 3,000 seat completion gym, and 990 seat performing arts center. Nearly 400,000 sf will be added on to the existing high school before razing roughly 350,000 sf of existing structure. The remaining 300,000 sf will be extensively renovated ensure the ‘new’ building has the same look, feel, and function throughout.

Completing a project of this scale while keeping the existing building operational during construction will be a complex task requiring continued coordination between SACS, HHS, the design team, and the construction manager. The phased addition, renovation, and demolition is set to occur from July 2020 through December 2024. Once complete Homestead High School will finally have space to educate students for generations to come.