Willow Lake Elementary School

CSO worked closely with Washington Township Schools’ administrators, building-level principals and faculty, and the Design Team to develop a program for a prototypical two story, K-5 elementary school with six 5-classroom learning neighborhoods, an administrative area, shared activity area, gymnasium, dining commons, discovery center, kitchen, and building support spaces.

Each learning neighborhood has a shared activity commons that is large enough for the entire neighborhood to gather and is easily accessible from each classroom. The overall layout of the learning neighborhoods creates two outdoor learning labs and an interior learning lab courtyard that are easily accessed from all learning neighborhoods and discovery center. The interior courtyard will serve as both educational outdoor space and a source of natural light for both levels.

Adjacent to the learning neighborhoods are the instructional spaces for art, world language, the project/idea lab, and a self-contained learning studio which provides the possibility of a flex classroom should a grade level size fluctuate and need an additional classroom. Music is the only enrichment activity not directly adjacent to the neighborhoods. The music lab is located adjacent to the dining commons where there is a raised platform for performances. This also provides a good separation for the higher noise levels in the music lab from the rest of the instructional spaces.

A centrally located Discovery Center has a large two-story open area for book stacks as well as a Media Production Lab.

Willow Lake Elementary School was built on the site of an existing elementary school that was completely demolished to accommodate the new school, parking, and site improvements while preserving the existing baseball diamonds and soccer field.

Promise Road Elementary School

The school is divided into two distinct wings. The primary wing houses 6 kindergarten rooms and 10 first and second grade classrooms while the secondary wing houses 13 third through fifth grade classrooms. Within each wing, classrooms are arranged to allow for grade separation with each grade occupying an individual corridor. This reduces the number of students in each corridor, improving circulation, congestion, and noise while providing maximum flexibility for future additions and changes.

The media center, art lab, cafeteria, and computer lab are located in the center of the building, making them easily accessible from each of the classroom wings. A stage opens to the cafeteria, LGI, and gymnasium allowing various sized audiences to be accommodated. The administration area is located at the front of the building, adjacent to the shared spaces for maximum accessibility.

The building uses a state-of-the-art geothermal system with daylight harvesting to reduce operating costs. All classrooms have controlled daylight, wireless technology, interactive presentation technology, and sound enhancement systems. The total project cost was delivered through a design-build delivery method over the course of 17 months.

Clearwater Elementary School

CSO worked closely with Washington Township Schools’ administrators, building-level principals and faculty, and the Design Team to develop a program for a prototypical two story, K-5 elementary school with six 5-classroom learning neighborhoods, an administrative area, shared activity area, gymnasium, dining commons, discovery center, kitchen, and building support spaces.

Each learning neighborhood has a shared activity commons that is large enough for the entire neighborhood to gather and is easily accessible from each classroom. The overall layout of the learning neighborhoods creates two outdoor learning labs and an interior learning lab courtyard that are easily accessed from all learning neighborhoods and discovery center. The interior courtyard will serve as both educational outdoor space and a source of natural light for both levels.

Adjacent to the learning neighborhoods are the instructional spaces for art, world language, the project/idea lab, and a self-contained learning studio which provides the possibility of a flex classroom should a grade level size fluctuate and need an additional classroom. Music is the only enrichment activity not directly adjacent to the neighborhoods. The music lab is located adjacent to the dining commons where there is a raised platform for performances. This also provides a good separation for the higher noise levels in the music lab from the rest of the instructional spaces.

A centrally located Discovery Center has a large two-story open area for book stacks as well as a Media Production Lab.

Clearwater Elementary School was built on the site of an existing elementary school that was completely demolished to accommodate the new school, parking, and site improvements while preserving the existing baseball diamonds and soccer field.