The Palladium

The design of the Palladium is based upon the traditional ‘shoe box’ shape concert hall with high ceilings and massive, sound-reflecting walls. This cornerstone of the Carmel City Center is designed to accommodate a myriad of music types.

The performance hall is designed as a multi-purpose space, yet its principal use is for live symphonic music. Through the design process it was decided that a truly multi-purpose room would not meet the highest standards for music production, however a room built for symphonic music can support many other types of events. In true concert hall fashion, the hall was developed as a single room, meaning there is no separation between the audience and the performers. This allows the initial sound to radiate freely without the constriction of a proscenium wall.

Within the hall, acoustics are further refined with the utilization of variable acoustic devices including automated curtains and a one-of-a-kind glass and steel acoustic canopy. The facility also includes state-of-the-art production lighting and sound systems with the capability to handle almost any production.

The space is designed to accommodate all patrons with visually excellent sight lines. The seating mix includes distinct locations including main floor, choral balcony, balcony, and box seats with private anterooms.

CSO was commissioned by the City of Carmel and the Carmel Redevelopment Commission to serve as the Architect of Record on The Palladium at the Center for the Performing Arts.  The firm worked with David M. Schwarz Architects and Artec Consultants, Inc. to design the only true concert hall in the region.

Columbus North High School

The goals for Columbus North High School included: flexible and adaptable learning spaces; an easily accessible, technology-rich environment; teacher and student work areas that inspire creativity, collaboration, problem solving, and innovation; the development of Centers of Excellence; and a safe and comfortable learning environment.

The project consists of 125,000 square feet of new additions and extensive renovations. By relocating the building entry to the opposite side and strategically placing building additions, the existing high school was transformed to fully address current needs and anticipate future needs. In order to bring the school up to current standards, five separate additions provide new space for music/performing arts, administrative areas, a new kitchen, additional classrooms, student resource and teacher resource areas, and for C4, a career and technical training center that serves multiple counties.

Interior renovations include the reconfiguration of existing areas to better accommodate the existing use of the space or to accommodate a new use for the space. Renovations of the first floor include the relocation of the existing cafeteria and kitchen areas, the relocation of the media center, new and/or renovated restrooms, and two new science labs.

Joshi Performance Hall

From the onset of this performance hall project, the design team was challenged to think outside of the box to craft a solution that would meet the demanding requirements of the Ernestine M. Raclin School of Music students and faculty within a very tight budget and time frame. The conversion of an existing lecture hall and its adjacent spaces into a state-of-the-art recital hall is the culmination of the Joshi family’s vision to provide young musicians and singers excellent educational and career development opportunities at IUSB. Indiana University turned to CSO for their performing arts expertise after the original design team was unable to provide a solution within budget. CSO’s design incorporates an electronic architectural sound system that provides optimal acoustical characteristics within the confines of the existing space without major, costly physical modifications.

Each element of the design supplements the integrated sound system, in order to achieve a harmonious balance of sound and “sparkle”. The formerly carpeted walls are now clad in rich wood paneling and acoustic diffusion systems which add physical and acoustical warmth to the space. Deep red tapestry has been integrated into the side walls to add an air of sophistication to the space. All of the elements work together and create an experience for every patron, allowing them to be completely enveloped by the art being performed on stage. The performance hall provides a world class venue for chamber music, soloist, and small ensemble performances in addition to providing the use of state-of-the-art recording equipment for students and faculty.

Silver Creek High School

Originally built in 1967 with subsequent smaller additions in the following decades, much of the building remained in its original state. While school pride and nostalgia is strong throughout the community, the building had fallen far behind the needs today’s learners.

Through an intense programming process, CSO was able to get to know the culture of the school, determine the current needs of teachers and students, and create an opportunity for the administration to dream about the future. The final solution adds much needed space for new classrooms, expanded performing arts, and a new auditorium. The new academic addition is situated across the front of the existing high school, creating a new front door and updated image for the community. The new ‘heart’ of the building is a two story ‘Student Union’ where students can spend time before, during, and after school, with learning resources and breakout spaces all around. Collaborative flex spaces and study rooms were located throughout the building to accommodate new learning styles and small group engagement. Capitalizing on a desire to expand elective course offerings, new specialty areas were added to accommodate TV/Radio, Project Lead the Way (PLTW), Culinary Arts, Entrepreneurship, and Art programs. CSO created a unique sense of place throughout the interior with touches of orange and blue ensuring there would no question you were at Silver Creek High School.

Throughout this project there was emphasis on making sure ‘we do things the right way’, while maintaining a focus on budget and the many other needs beyond the High School building. CSO is humbled to be chosen to help steward SCSC through this process and provide a truly transformational project for this community that will impact students for decades to come.

Homestead High School

Over the last several years the administration at Southwest Allen County Schools (SACS) began to dream about making major changes at Homestead High School (HHS). Primarily a single story building, students struggled to travel from one side to another during passing periods and there were few spaces able to facilitate informal student interactions or collaborative group work.

CSO was brought on board with local architect MKM and educational consultant Brain Spaces to begin programming and planning for the future Homestead. Extensive meetings with students, staff, parents, and community members quickly revealed immense support for changes at the high school and a desire for the building to better represent and support the students who walked its hallways. The design team collaborated to maximize the amount of new space to be constructed while leveraging portions of the existing facility to reach the desired program requirements.

The resultant design will include a new two story academic wing, large student commons, 3,000 seat completion gym, and 990 seat performing arts center. Nearly 400,000 sf will be added on to the existing high school before razing roughly 350,000 sf of existing structure. The remaining 300,000 sf will be extensively renovated ensure the ‘new’ building has the same look, feel, and function throughout.

Completing a project of this scale while keeping the existing building operational during construction will be a complex task requiring continued coordination between SACS, HHS, the design team, and the construction manager. The phased addition, renovation, and demolition is set to occur from July 2020 through December 2024. Once complete Homestead High School will finally have space to educate students for generations to come.