BMW Group Training Center

The design for the building incorporates BMW Group’s guiding principles of modern architecture:  monolithic, compact and cubic volume; asymmetrically composed and well-proportioned openings employing visual combination of smaller openings; a greater proportion of wall area to openings; and pure, simple detailing from a concise pallet of materials.

The training areas are set up to train for specific functions and each includes a classroom for theoretical instruction, practical training workshop areas, equipment prep, and storage area. Additionally, there is office space and conference areas for full time personnel, and a break room with seating for 60.

The building is designed with expansion capabilities for four additional classrooms totaling approximately 11,000 square feet.

Monarch Beverage

Over the past six decades, Monarch has distinguished itself as an industry leader through its efficient operations and customer service and a community leader through its sustainability and service initiatives. They are focused on providing an ever-escalating standard of service to their customers and their ability to do so is directly impacted by the operation of their distribution facility. CSO worked with Monarch to ensure that their facility would meet the needs of their operation.

The distribution area utilizes an automated material handling system to palletize products for more than 80 daily delivery routes. The entry façade features an integral loading canopy anchored with a 2-story curtainwall and precast entry feature. The 2-story lobby, conference/training spaces, and a tasting room are all featured within the interior.

The facility includes 55,000 square feet of corporate headquarters office space, 457,500 square feet of warehouse space, 21,300 square feet of cold storage, and a 19,000 square foot fleet maintenance building.