Tri-North Middle School

Monroe County Community School Corporation (MCCSC) identified the need to replace the aging Tri-North Middle School. CSO and BrainSpaces, an expert in brain-based educational planning and design, led a visioning and programming process that enabled CSO to design a new building tailored to the specific needs and vision of Tri-North students, teachers, and administrators.

The building layout utilizes next generation learning elements including an open media center, collaboration spaces, and small group rooms throughout the building. Teachers and administrators expressed the need for spaces to be flexible and adaptable to a rapidly changing educational world. CSO’s design addresses the need for flexibility by implementing features such as the use of operable theater seating in the Performance / Large Group Instruction space, operable partitions in Science and STEM labs, and spaces that are planned to facilitate the use of both departmental and interdisciplinary teaching models.

MCCSC also emphasized the need for sustainable design considerations which were implemented with plans for a geothermal system, solar array on the gym roof, and use of local materials and native plants. The leadership of MCCSC is excited for the New Tri-North Middle School to be the crown jewel for this Bloomington community.

Promise Road Elementary School

The school is divided into two distinct wings. The primary wing houses 6 kindergarten rooms and 10 first and second grade classrooms while the secondary wing houses 13 third through fifth grade classrooms. Within each wing, classrooms are arranged to allow for grade separation with each grade occupying an individual corridor. This reduces the number of students in each corridor, improving circulation, congestion, and noise while providing maximum flexibility for future additions and changes.

The media center, art lab, cafeteria, and computer lab are located in the center of the building, making them easily accessible from each of the classroom wings. A stage opens to the cafeteria, LGI, and gymnasium allowing various sized audiences to be accommodated. The administration area is located at the front of the building, adjacent to the shared spaces for maximum accessibility.

The building uses a state-of-the-art geothermal system with daylight harvesting to reduce operating costs. All classrooms have controlled daylight, wireless technology, interactive presentation technology, and sound enhancement systems. The total project cost was delivered through a design-build delivery method over the course of 17 months.