Phase I of the project was particularly challenging due to the owner’s intent to build up from an existing structure. The configuration of the existing structure required that designers incorporate a number of potentially awkward column locations. Ultimately, this became a feature of the building design as the column placement dictated a wide array of residential unit variations and influenced the façade. By addressing these challenges with unique design solutions, the owner can offer tenants more layout options and the building boasts a more dynamic façade that brings new life to the streetscape. An open third floor pool and recreation deck provides dramatic views of the downtown area for all residents along with two interior courtyards featuring a fountain, vegetable garden, bocce court, and putting green.



CSO went on to design Phase 2 of the project, which involved the addition of two buildings, the Mentor and Muse at Artistry, which provide additional living options to fit different types of lifestyles, including 354 square foot eco-suites for those who need minimal space.

,



This development will enhance economic growth in the area and will draw new residents to the city. We need diverse, unique housing to retain and attract residents. “
–Kokomo Mayor Greg Goodnight




,




Each apartment floor features CSO-designed custom graphics reinforcing spirit of place.








Two 6th-floor courtyards, facing east and west, provide additional outdoor amenities, complementing the expansive rooftop spaces.


,




Due to plans for a YMCA addition to the building, a temporary reception desk was installed. The large glass wall shown above would later become an entryway for the YMCA. With careful planning, the addition of the YMCA coordinated seamlessly with the Aquatic Center.


The 50-meter pool can be separated into three sections via movable bulkheads.
The natatorium also includes 1 and 3-meter diving boards and bleachers which seat 650 spectators.





Westfield High School’s 25-meter pool was originally built in 1997. As enrollment increased over time, the facility could no longer accommodate the growing needs of the student body. With the completion of the new Aquatic Center, the original high school pool become obsolete. It was subsequently filled in, and the space was repurposed as a wellness center — also designed by CSO.
,